We make and manage commissions for individuals, public bodies, offices, architects, designers, and everyone in between.
Case Study - OPDC Head Office
Brief: Design and build 150 items of furniture for the OPDC offices in Park Royal.
Timeline: 12 months.
Completion Date: July, 2024.
Case Study - Copa Table
Brief: Design and build a unique marquetry table for a private client.
Timeline: 1 month.
Completion Date: June, 2023.
Case Study - Memorial Bench
Brief: Design and build a durable memorial piece for a private client.
Timeline: 1 month.
Completion Date: August, 2024.
Case Study - London Living Wage Awards
Brief: Design and make trophies for Ealing’s London Living Wage Awards.
Timeline: 1 month.
Completion Date: March, 2025.
Case Study - Ealing Libraries
Brief: Design and make a range of furniture, standalone, and wall pieces for Acton, Northolt, and Southall Libraries.
Timeline: 6 months.
Completion Date: April, 2025.
Case Study - Royal Academy of Art / Metropolitan Workshop
Brief: Design a sculpture to capture ‘the life between buildings’ as part of Metropolitan Workshop’s architectural practice. The sculpture was selected to be part of the Royal Academy of Art’s prestigious Summer Exhibition.
Timeline: 2 months.
Completion Date: June, 2025.